Solar Site Assessment Services
A3: Complete Stand-Alone Assessment
Completed as a stand-alone assessment eqivalent to
Basic and Advanced assessment combined.
Basic Assessment Component
- Suitability
- Site
- Building
- PV installation
- Preliminary installation prerequisites
- System type: grid-tied, grid-tied w/battery backup,
off-grid
- National Electric Code
- Electric service provider
- Analysis of utility service provider requirements
- PV, disconnects, inverter, other BOS
- Metering
- Net metering
- Electric bill review
- Electric energy efficiency review
- Objective of solar electric generation: Percent
electricity provided by PV
- offset
- net-zero
- net producer
- Economics and financial analysis
- Rebates, tax credits & other incentives
- General PV literature
- Resources: Books, Websites, Institutions
- Discussion with owner
- On-site visit
- Written report
- Follow-up telephone review
Advanced Assessment Component
- Site visit
- Detailed site suitability analysis
- Shading
- Infrastructure constraints
- Location constraints
- Detailed building suitability
- Roof
- Wiring
- PV location
- Balance of equipment (BOS) location
- Detailed National Electric Code (NEC) requirements
- Analysis of utility service provider requirements
- Complete review and analysis of electric bill
- Daily kilowatt-hour consumption
- Monthly kilowatt-hour consumption
- Annual kilowatt-hour consumption
- Household size and lifestyle influences
- Electric energy efficiency review and recommendations
- Lighting
- Heating
- Cooling
- Domestic hot water
|
- Water/sewer
- Kitchen appliances
- Other household appliances
- Electronics
|
- Detailed AC energy production analysis
- potential cost savings
- net metering
- Financial spreadsheet analysis: cost, payback, cash flow,
return on investment/internal rate of return.
- Environmental benefit assessment: elimination of CO2
greenhouse gas emissions (GHGe) and offsetting equivalents
- Rebates/incentives, federal and state tax credits:
availability and recommendations
- Financing
- Specific PV literature and system and product recommendations
- Installer options
- Discussion with owner
- Two to three hours on site
- Written report
- In person follow-up
- Telephone follow-up
Cost: $365 |